IDCS involvement at Wilmette Pump Station consisted of the complete demolition and design of a new incoming utility service to replace the existing service which had passed its useful life expectancy, replacement of 1966 era substation transformers and their associated primary circuit breakers, replacement of the lighting system within the building as well as on the exterior, new controls of the gate structures (including lighting above the new gate control bridge), design of an annunciator for communication with the public during gate operations, a new control system, with communication and control from both the Main Waterways Control Center and North Side Water reclamation plant.
IDCS was a sub-consultant on the City of Evanston Water Utility electrical hazard assessment. The project included the assessment of the entire water treatment facility, and furnishing the required field markings (labels) for the electrical distribution equipment.
Intelligent Design & Construction Solutions, LLC was hired by the City of Evanston for the Evanston Water Utility SCADA Improvements Project.
Displaying: 1 - 3 of 3