There are 2 item(s) tagged with the keyword "CH2M Hill".
Displaying: 1 - 2 of 2
The Calumet Water Reclamation Plant Disinfection Facilities project was a fast track design for the installation of the first chemical disinfection system to the plant. This project was designed in under one year.
IDCS was selected to participate as a sub-consultant to CH2M Hill for the Lemont Water Reclamation Plant Wet Weather Treatment Facility (WWTF) upgrades project. This is a multi-phased project which includes the installation of a 5MG wet weather reservoir for storage of the initial excess flow, and the installation of a wet weather treatment facility which provides primary treatment and disinfection for flows above treatment and storage capacity.
Displaying: 1 - 2 of 2