Search Results

There are 3 item(s) tagged with the keyword "CDA".

Displaying: 1 - 3 of 3

1. Upgrade of the Chillers and South Cooling Tower (OHare)

O'Hare International Airport serves over 150,000 passengers on a daily basis. The Heating and Refrigeration (H&R) Building is responsible for heating and cooling all of the airport buildings.

Tags: Electrical Design, CDA, RME, Chicago IL
2. OHare East Cooling Tower Replacement

IDCS was contracted to participate in the East Cooling Tower Replacement project at the Chicago O'Hare International Airport. The East Cooling Tower is responsible for providing cooling to the Terminal Building at O'Hare International Airport.

Tags: Government, Electrical Design, Federal Classification Codes, Green Infrastructure, CDA, Burns & McDonnell, OHare International Airport, Chicago IL
3. OHare Firefighter Simulator Building

IDCS was responsible for providing the design of the Electrical Distribution and Lighting Systems for a new Firefighter Simulator Building for the City of Chicago at the O'Hare International Airport. The building was approximately 3,000 square feet and included an 18' high simulator area.

Tags: Government, Electrical Design, Instrumentation Design, Green Infrastructure, CDA, Hyre Electric Company, Bensenville IL, Drafting

Displaying: 1 - 3 of 3

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google