1. Stickney WRP Effluent Water Pump Station

IDCS was selected by AECOM to assist in the electrical and control design of an effluent water pump station for the MWRDGC Stickney WRP.  The pump station was to supplement the supply of treated effluent that was reused for non-potable water applications throughout the plant.

Tags: MWRDGC, Water & Wastewater, Electrical Design, AECOM CTE, Chicago IL
2. Condition Assessment Report Eugene Sawyer Water Purification Plant

IDCS was contracted to perform Electrical Engineering Services for the Condition Assessment of the South Water Purification Plant

Tags: Vulnerability and Risk Assessments, Water & Wastewater, AECOM CTE, Electrical Design, Instrumentation Design, CDWM, Chicago IL
3. Calumet TARP Study

IDCS assisted in the cost estimate and electrical layout for both 5 and 15 kV, 9000HP variable frequency drive and motor replacements at this 300 foot deep tunnel pumping station.

Tags: Vulnerability and Risk Assessments, Electrical Design, Water & Wastewater, Green Infrastructure, MWRDGC, AECOM CTE, Chicago IL
4. Condition Assessment Report South Water Purfication Plant

IDCS was contracted to perform Electrical Engineering Services for the Condition Assessment of the South Water Purification Plant. These services included 2 site assessments of all of the facilities at the plant.

Tags: Water & Wastewater, Vulnerability and Risk Assessments, Green Infrastructure, CDWM, AECOM CTE, Chicago IL
5. Jardine Water Purification Plant and South Water Purification Plant Paging System Upgrades

IDCS was contracted to perform Electrical Engineering Construction Services during the construction portion of the JWPP/SWPP Emergency Paging System Upgrades Project.

Tags: Water & Wastewater, Construction Services, Green Infrastructure, AECOM CTE, CDWM, Chicago IL
6. New Battery E Facilities at the North Side Water Reclamation Plant

IDCS provided CAD work support for AECOM to generate a preliminary design for an expansion of aeration systems at the Terrence J O'Brien WRP.

 

Tags: Water & Wastewater, Green Infrastructure, MWRDGC, AECOM CTE, Chicago IL, Drafting
7. Springfield Ave Pump Station - Phase III Services

The Chicago Department of Water Management (CDWM) and AECOM developed energy saving solutions for converting the Springfield Avenue Pump Station from steam to electric power. This conversion process is estimated to have saved 17,000 tons in CO2 emissions.

Tags: Water & Wastewater, Construction Services, Vulnerability and Risk Assessments, Green Infrastructure, CDM, AECOM CTE, Chicago IL

Displaying: 1 - 7 of 7

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google