1. DC-02 & DC-03 Sanitary Relief

The DC-02 & DC-03 diversion structure (also known as the Pendleton diversion structure) was designed to divert flow from the trunk sewer to the Deer Creek Sanitary Tunnel during storm events.

Tags: MSD, St. Louis MO, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design
2. Deer Creek Sanitary Tunnel

 

The Deer Creek Sanitary Tunnel is designed to store peak flows from the existing collection system that exceed the capacity of the existing trunk sewers or the capacity of the downstream treatment plant.

Tags: MSD, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design, St. Louis MO, Clayton MO
3. Dewatering Pump Station - LMRDP Improvements

The Lower and Middle River Des Peres (LMRDP) CSO Storage Tunnel Dewatering Pump Station (DPS) will receive all the flow entering the LMRDP CSO Storage Tunnel. The DPS peak design flow is 100 MGD and will pump either to the Lemay Wastewater Treatment Plant (WWTP) or the Enhanced High Rate Clarification (EHRC) facility. The DPS will operate only during or after a weather event that requires the use of the storage tunnel. The bar screen will be located upstream of the DPS to prevent large debris from damaging the pumps.

Tags: MSD, Jacobs, HDR, Water & Wastewater, Instrumentation Design, St. Louis MO
4. Lemay No.3 Pump Station

Proposed Lemay Pump Station No. 3 is a wet-pit/dry-pit station with a firm capacity of 15MGD.  Lemay No. 3 Pump Station will accept the flows from the Jefferson Barracks Tunnel and pump to the Lemay WWTF.  The new Lemay No. 3 PS will replace the existing pump station.  The Lemay No. 3 PS will be the network connection point of all the Intake structures and level sensors in the Jefferson Barracks Tunnel system, therefore control and monitoring of the Tunnel will be consolidated at the Lemay No. 3 PS. 

Tags: MSD, Jacobs, HDR, Water & Wastewater, Instrumentation Design, St. Louis MO
5. Instrumentation and Controls Design Criteria

MSD retained IDCS to create an Instrumentation and Controls Design Criteria Manual; this is used to describe standard instrumentation components and control philosophy for all pump station and treatment facility control.

Tags: MSD, Instrumentation Design, HDR, Water & Wastewater
6. Lemay Pump Stations 1 and 2 Switchgear Improvements

IDCS provided design services for I&C and communications for Lemay Pump Station 1 switchgear and VFD replacement which included engineering evaluations, preparation of contract drawings and specifications.

Tags: Water & Wastewater, Instrumentation Design, MSD, Construction Services, Donohue, St. Louis MO, Green Infrastructure
7. Maline Creek CSO Storage Facility

The Maline Creek Local Storage Facility Tunnel (MCT) and Tunnel Dewatering Pump Station (MCTDPS) is designed to relieve the Bissell Point North Interceptor Tunnel during high flows and store 12.5 MGD until the flows recede.

Tags: St. Louis MO, Instrumentation Design, Water & Wastewater, MSD, Jacobs, HDR
8. Bissell Disinfection

Intelligent Design and Construction Solutions, LLC completed the instrumentation and control design for the disinfection system at the Bissell Wastewater Treatment Plant. There are two disinfection systems at Bissell WWTP, both of which utilize a chlorination/dechlorination chemical system.

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, Construction Services, MSD, HDR, St. Louis MO
9. Lemay Disinfection Improvements

Intelligent Design and Construction Solutions, LLC completed the design for the instrumentation and control of the revised disinfection systems at the Lemay Wastewater Treatment Plant.

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, Construction Services, Green Infrastructure, MSD, HDR, St. Louis MO
10. Lemay Outfall 002 Elimination

The Lemay Ash Pump Station pumps the runoff from ash drying lagoons back to the main Lemay Water Treatment Plant (WTP), preventing the runoff from flowing into the Mississippi River through Outfall 002.

Tags: Water & Wastewater, Instrumentation Design, Green Infrastructure, MSD, HDR, St. Louis MO

Displaying: 1 - 10 of 14

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google