Upper Des Plaines Pumping Station

Upper Des Plaines Pumping Station

Owner  - MWRDGC
Client      -   MWH
Location   - River Forest, Illinois
 

The project was a complete study and rehabilitation of a major pump station serving the Upper Des Plaines River service area, and installation and control of a bypass to the TARP System to accommodate emergency events. IDCS was responsible for all Electrical and Instrumentation studies, as well as design and construction services on this major project. Work included power system analysis, medium voltage service from two sources with automatic transfer and stand-by generation, medium and low voltage motor control, flow measurement, control and telemetry systems, and building electrical in both classified and unclassified areas. The pump station is unmanned. Controls and monitoring are via telemetry from the Stickney Wastewater Reclamation Plant via radios. The most critical challenge was accommodating the electrical equipment in the existing cottage-like forest preserve sited structure.

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google