Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study

Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study
Owner  - MWRDGC
Client      -   Greeley & Hansen
Location   - Chicago, IL
 
MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.
The old Imhoff Tank provided substandard treatment and was quite malodorous, which in a residential area led to continuous complaints. The new facilities removed process damaging grit more efficiently, settled primary sludge, and greatly increased biogas generation. The odor control system also enhanced the quality of life in the surrounding communities.
IDCS was selected by the prime consultant, Greeley and Hansen, to perform the Arc Flash and Coordination Studies for the new construction.

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google