South Water Purification Plant Switchgear and Generator Improvements

South Water Purification Plant Switchgear and Generator Improvements

Owner  - CDWM
Client      -   Greeley & Hansen
Location   - Chicago, Illinois
 

This project encompasses a largely electrical scope with some minor civil, structural, and architectural scope. This project is anticipated to last approximately 40 months total, including one month of mobilization and one month of demobilization. Major components of this project include: Replacement of temporary 460V generators with permanently installed 2,300V packaged diesel generator units,Installation of new paralleling switchgear,Replacement of 2,300V plant switchgear,Replacement of selected low voltage units substations and switchboards,Replacement of medium voltage motor control equipment,Architectural and structural accommodations for the new electrical equipment installations IDCS will serve as part-time reisent for Electrical and Controls scope. Observation of site activities for Electrical work as assigned by the Resident Project Representative,

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google