Pump Station Vulnerability and Risk Assessment Study

Pump Station Vulnerability and Risk Assessment Study

Owner  - MWRDGC
Client      -   Donohue
Location   - Chicago, IL
 

IDCS evaluated six of the largest and/or most critical MWRDGC pumping stations which pump raw sewage from the sanitary sewer system to three wastewater reclamation plants. This project consisted of reviewing existing District data, attending site visits to gather data utilizing an IDCS developed check list, regrouping with the entire project team to discuss findings from each site, and writing a report to define the vulnerabilities and risks found at each pumping station. IDCS was specifically assigned to assessments associated with electrical power vulnerabilities and risks at each pumping station.

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google