Contract 1

Contract 1

Owner  - FMWRD
Client      -   Deuchler (WEDA)
Location   - Oswego, IL
 

Complete Electrical and Control design for the addition of an Emergency Pump Station and improvements to the plant effluent for the Fox Metro Water Reclamation District Wastewater Treatment Plant. The Pump Station design included variable frequency drives for pumps, connection into the existing plant SCADA system, new medium voltage feeders, switchgear and substation, motor control center design, low voltage switchgear design, provisions for classified areas and provisions for future connection of an overflow storage facility. This project also included improvements to the plant effluent and chlorination systems. Medium voltage feeders that powered the entire plant were disturbed due to the addition of the water conduits. Provisions for construction which did not disturb the plant operation were made using jumper feeds and portable generators. Plant effluent design also included site lighting, connection of a new sludge collector system into plant SCADA and motor control center replacement. Plant chlorination design included addition of a new electrical room in the Tertiary Filter Building with a new motor control center. The new MCC sub-feeds, and is designed to replace, the existing MCC. The building has new medium voltage switchgear which provides an extra service to the building, critical to plant operation. The water conduits required the integration of many new sluice gates into the plant SCADA system for remote operation and give the plant much flexibility in treatment.

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google