Condition Assessment Report South Water Purfication Plant

Condition Assessment Report South Water Purfication Plant

Owner  - CDWM
Client      -   AECOM / CTE
Location   - Chicago, IL
 

IDCS was contracted to perform Electrical Engineering Services for the Condition Assessment of the South Water Purification Plant. These services included 2 site assessments of all of the facilities at the plant. IDCS compiled condition status of each piece of electrical equipment and instrumentation using standardized forms and photo documentation. IDCS then assisted AECOM in compiling Capital Cost Opinions which were to be used by CDWM in order to allocate funds for capital improvement projects for the next 5 years. Capital cost opinions were grouped by system or by similarity of work and included a brief scope of work, cost estimate for design and construction, anticipated schedule and the priority level of project.

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google