IDCS was contracted to perform Electrical Engineering Services for the Condition Assessment of the South Water Purification Plant. These services included 2 site assessments of all of the facilities at the plant. IDCS compiled condition status of each piece of electrical equipment and instrumentation using standardized forms and photo documentation. IDCS then assisted AECOM in compiling Capital Cost Opinions which were to be used by CDWM in order to allocate funds for capital improvement projects for the next 5 years. Capital cost opinions were grouped by system or by similarity of work and included a brief scope of work, cost estimate for design and construction, anticipated schedule and the priority level of project.