Calumet Water Reclamation Plant Disinfection Facilities

Calumet Water Reclamation Plant Disinfection Facilities

Owner  - MWRDGC
Client      -   CH2M Hill
Location   - Chicago, IL
Services   - Design - Electrical;#1;#Construction Services;#3

The Calumet Water Reclamation Plant Disinfection Facilities project was a fast track design for the installation of the first chemical disinfection system to the plant. This project was designed in under one year. The Calumet WRP has the capacity to treat approximately 350 MGD, this project will disinfect the effluent water using sodium hypochlorite and sodium bisulfate prior to discharge. IDCS was responsible for the electrical design of a new Chemical Storage and Pumping Building, as well as site work for power distribution, including providing temporary power to the police trailer during the construction phase. Extensive site investigation was required for locating adequate power supply and the routing of utilities to supply power. IDCS also provided electrical design for lighting, medium and low voltage power, and the SCADA and telephone systems. Additionally, IDCS developed a Statement of Probable Cost for the electrical work. This project was bid under the engineers estimate and is currently under construction with a completion date set for December 2015. IDCS is currently providing construction services on the project which include reviewing shop drawings, answering RFIs, and final punch-list review.

 

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google