Featured Projects

Evanston Water Utility Arc Flash Study
Evanston Water Utility Arc Flash Study

IDCS was a sub-consultant on the City of Evanston Water Utility electrical hazard assessment. The project included the assessment of the entire water treatment facility, and furnishing the required field markings (labels) for the electrical distribution equipment.

Tags: Water & Wastewater, Vulnerability and Risk Assessments, Green Infrastructure, Arc Flash and Coordination Studies, Drafting, City of Evanston, Greeley & Hansen, Evanston IL
Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study
Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study

MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.

Tags: Chicago IL, Greeley & Hansen, Water & Wastewater, Arc Flash and Coordination Studies
Disinfection Facilities at the O'Brien WRP Electrical Study
Disinfection Facilities at the O'Brien WRP Electrical Study

IDCS was selected to participate as a sub-consultant to Greeley & Hansen for the project to add ultraviolet disinfection facilities to the Terrence J. O’Brien (North Side) Water Reclamation Plant.

Tags: Water & Wastewater, Greeley & Hansen, MWRDGC, Arc Flash and Coordination Studies
Repair of Electrical Infrastructure Systems 5th Medical Group, Minot AFB
Repair of Electrical Infrastructure Systems 5th Medical Group, Minot AFB

IDCS worked as a sub-consultant to SpecPro for power studies for an Air Force base located in Minot North Dakota. Utilizing SKM software IDCS completed a short circuit study which included over 300 bus points from the incoming service entrance to the panelboard distribution level.

Tags: Government, Vulnerability and Risk Assessments, Green Infrastructure, USACE, SpecPro, Minot ND, Arc Flash and Coordination Studies, Drafting
Tyndall Air Force Base
Tyndall Air Force Base

Tyndall AFB Medical Center is a 50,000 square foot building contained over 70 distribution panels in various stages of life, as well as 30 transformers. The scope of this project was to update and eliminate panels and transformers where possible and create a new efficient electrical distribution system.

Tags: Government, Vulnerability and Risk Assessments, Electrical Design, Construction Services, Green Infrastructure, USAF, Kroeschell, Panama City FL, Arc Flash and Coordination Studies

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google