Search Results

There are 2 item(s) tagged with the keyword "Parsons".

Displaying: 1 - 2 of 2

1. DC-02 & DC-03 Sanitary Relief

The DC-02 & DC-03 diversion structure (also known as the Pendleton diversion structure) was designed to divert flow from the trunk sewer to the Deer Creek Sanitary Tunnel during storm events.

Tags: MSD, St. Louis MO, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design
2. Deer Creek Sanitary Tunnel

 

The Deer Creek Sanitary Tunnel is designed to store peak flows from the existing collection system that exceed the capacity of the existing trunk sewers or the capacity of the downstream treatment plant.

Tags: MSD, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design, St. Louis MO, Clayton MO

Displaying: 1 - 2 of 2

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google