Water & Wastewater

Evanston Water Utility Arc Flash Study
Evanston Water Utility Arc Flash Study

IDCS was a sub-consultant on the City of Evanston Water Utility electrical hazard assessment. The project included the assessment of the entire water treatment facility, and furnishing the required field markings (labels) for the electrical distribution equipment.

Tags: Water & Wastewater, Vulnerability and Risk Assessments, Green Infrastructure, Arc Flash and Coordination Studies, Drafting, City of Evanston, Greeley & Hansen, Evanston IL
Stickney WRP Effluent Water Pump Station
Stickney WRP Effluent Water Pump Station

IDCS was selected by AECOM to assist in the electrical and control design of an effluent water pump station for the MWRDGC Stickney WRP.  The pump station was to supplement the supply of treated effluent that was reused for non-potable water applications throughout the plant.

Tags: MWRDGC, Water & Wastewater, Electrical Design, AECOM CTE, Chicago IL
DC-02 & DC-03 Sanitary Relief
DC-02 & DC-03 Sanitary Relief

The DC-02 & DC-03 diversion structure (also known as the Pendleton diversion structure) was designed to divert flow from the trunk sewer to the Deer Creek Sanitary Tunnel during storm events.

Tags: MSD, St. Louis MO, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design
Deer Creek Sanitary Tunnel
Deer Creek Sanitary Tunnel

 

The Deer Creek Sanitary Tunnel is designed to store peak flows from the existing collection system that exceed the capacity of the existing trunk sewers or the capacity of the downstream treatment plant.

Tags: MSD, Parsons, Water & Wastewater, Electrical Design, Instrumentation Design, St. Louis MO, Clayton MO
Jardine Water Purification Plant Chlorine System Improvements
Jardine Water Purification Plant Chlorine System Improvements

The Jardine Water Purification Plant (JWPP), is the largest capacity water filtration plant in the world, located in Chicago, Illinois. It draws raw water from two of the city's water cribs far offshore in Lake Michigan and sends nearly one billion gallons (4 million m3) of water per day to consumers in the north and central portions of the city. CMT is the lead engineer for the Chlorine Upgrade. This upgrade encompasses the addition of a redundant chlorine scrubber, modifications to the existing SCADA System to align the Chlorine Control Room with the JWPP SCADA Control Room and upgrades to the existing evaporators, chlorinators and chlorinator flow controllers (26) to a new control platform.

Tags: CDWM, Water & Wastewater, Instrumentation Design, Chicago IL
Eugene Sawyer (South Water) Purification Plant Switchgear and Generator Improvements (Resident Engineering)
Eugene Sawyer (South Water) Purification Plant Switchgear and Generator Improvements (Resident Engineering)

The South Water Purification Plant project includes the installation of generators with paralleling switchgear in a permanent structure to provide emergency power for the plant to the Main 2300V Switchgear. IDCS served as a resident for the Electrical scope of the construction

Tags: Chicago IL, Greeley & Hansen, Construction Services, CDWM, Water & Wastewater
Calumet Biogas Renewable Energy Project
Calumet Biogas Renewable Energy Project

The Digester Gas Utilization Facilities, at the Calumet Water Reclamation Plant (CWRP) will enable the District to treat biogas generated from their current digestion process along with future digestion of a high-strength organic waste stream (currently under design by the District).  The digester gas from these two sources will be treated at the CWRP to a level of quality acceptable for injection into a natural gas pipeline, through the new High BTU plant. 

Tags: MWRDGC, Chicago IL, Electrical Design, Instrumentation Design, Water & Wastewater
Wilmette Pump Station and Evanston Pump Station Rehabilitation
Wilmette Pump Station and Evanston Pump Station Rehabilitation

IDCS involvement at Wilmette Pump Station consisted of the complete demolition and design of a new incoming utility service to replace the existing service which had passed its useful life expectancy, replacement of 1966 era substation transformers and their associated primary circuit breakers, replacement of the lighting system within the building as well as on the exterior, new controls of the gate structures (including lighting above the new gate control bridge), design of an annunciator for communication with the public during gate operations, a new control system, with communication and control from both the Main Waterways Control Center and North Side Water reclamation plant.

Tags: MWRDGC, Donohue, Water & Wastewater, Instrumentation Design, Electrical Design, Evanston IL
Central Park Pumping Station Electrification
Central Park Pumping Station Electrification

The Central Park Pumping Station Electrification project is to convert a steam-powered pumping station to electrically driven pumps, and rehabilitate and upgrade the electrical services to the pump station.

Tags: Greeley & Hansen, CDWM, Chicago IL, Water & Wastewater, Electrical Design
Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study
Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study

MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.

Tags: Chicago IL, Greeley & Hansen, Water & Wastewater, Arc Flash and Coordination Studies
Evanston Water Utility SCADA Upgrades
Evanston Water Utility SCADA Upgrades

Intelligent Design & Construction Solutions, LLC was hired by the City of Evanston for the Evanston Water Utility SCADA Improvements Project.

Tags: Water & Wastewater, Construction Services, Green Infrastructure, CDM, City of Evanston, Evanston IL
Lemay No.3 Pump Station
Lemay No.3 Pump Station

Proposed Lemay Pump Station No. 3 is a wet-pit/dry-pit station with a firm capacity of 15MGD.  Lemay No. 3 Pump Station will accept the flows from the Jefferson Barracks Tunnel and pump to the Lemay WWTF.  The new Lemay No. 3 PS will replace the existing pump station.  The Lemay No. 3 PS will be the network connection point of all the Intake structures and level sensors in the Jefferson Barracks Tunnel system, therefore control and monitoring of the Tunnel will be consolidated at the Lemay No. 3 PS. 

Tags: MSD, Jacobs, HDR, Water & Wastewater, Instrumentation Design, St. Louis MO
Disinfection Facilities at the O'Brien WRP Electrical Study
Disinfection Facilities at the O'Brien WRP Electrical Study

IDCS was selected to participate as a sub-consultant to Greeley & Hansen for the project to add ultraviolet disinfection facilities to the Terrence J. O’Brien (North Side) Water Reclamation Plant.

Tags: Water & Wastewater, Greeley & Hansen, MWRDGC, Arc Flash and Coordination Studies
Dewatering Pump Station - LMRDP Improvements
Dewatering Pump Station - LMRDP Improvements

The Lower and Middle River Des Peres (LMRDP) CSO Storage Tunnel Dewatering Pump Station (DPS) will receive all the flow entering the LMRDP CSO Storage Tunnel. The DPS peak design flow is 100 MGD and will pump either to the Lemay Wastewater Treatment Plant (WWTP) or the Enhanced High Rate Clarification (EHRC) facility. The DPS will operate only during or after a weather event that requires the use of the storage tunnel. The bar screen will be located upstream of the DPS to prevent large debris from damaging the pumps.

Tags: MSD, Jacobs, HDR, Water & Wastewater, Instrumentation Design, St. Louis MO
Instrumentation and Controls Design Criteria
Instrumentation and Controls Design Criteria

MSD retained IDCS to create an Instrumentation and Controls Design Criteria Manual; this is used to describe standard instrumentation components and control philosophy for all pump station and treatment facility control.

Tags: MSD, Instrumentation Design, HDR, Water & Wastewater
Stickney Westside Primary Settling Tanks and Aerated Grit Facility

MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.

Tags: Chicago IL, Greeley & Hansen, Instrumentation Design, Water & Wastewater
Lemay Disinfection Improvements
Lemay Disinfection Improvements

Intelligent Design and Construction Solutions, LLC completed the design for the instrumentation and control of the revised disinfection systems at the Lemay Wastewater Treatment Plant.

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, Construction Services, Green Infrastructure, MSD, HDR, St. Louis MO
Jefferson Barracks Tunnel - LMRDP Improvements
Jefferson Barracks Tunnel - LMRDP Improvements

The Jefferson Barracks Tunnel will be responsible for conveying sewage to the Lemay Water Treatment Plant (Lemay WTP) as well as storing potential combined sewer overflow (CSO) and storm sewer overflow (SSO) during a wet weather event.

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, Vulnerability and Risk Assessments, Green Infrastructure, MSD, Jacobs, St. Louis MO
Lemay Pump Stations 1 and 2 Switchgear Improvements
Lemay Pump Stations 1 and 2 Switchgear Improvements

IDCS provided design services for I&C and communications for Lemay Pump Station 1 switchgear and VFD replacement which included engineering evaluations, preparation of contract drawings and specifications.

Tags: Water & Wastewater, Instrumentation Design, MSD, Construction Services, Donohue, St. Louis MO, Green Infrastructure
Maline Creek CSO Storage Facility
Maline Creek CSO Storage Facility

The Maline Creek Local Storage Facility Tunnel (MCT) and Tunnel Dewatering Pump Station (MCTDPS) is designed to relieve the Bissell Point North Interceptor Tunnel during high flows and store 12.5 MGD until the flows recede.

Tags: St. Louis MO, Instrumentation Design, Water & Wastewater, MSD, Jacobs, HDR

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, Illinois 60606
708.445.7537

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google