Search Results

There are 5 item(s) tagged with the keyword "MWH".

Displaying: 1 - 5 of 5

1. CDoE Solar Assessment

Intelligent Design and Construction Solutions, LLC was subcontracted by MWH for the City of Chicago Department of Environment (CDoE) to visit and assess solar array sites. These sites varied in nature from Chicago Public Schools, to community centers, to a heritage museum.

Tags: Government, Vulnerability and Risk Assessments, Green Infrastructure, CDOE, Solar, MWH, Chicago IL
2. Albany Park Stormwater Diversion Tunnel

The Albany Park Stormwater Diversion Tunnel project consists of a 5700 foot long 18 foot finished diameter rock tunnel located beneath Foster Avenue in the City of Chicago.  This tunnel will divert excess stormwater from the North Branch of the Chicago River (NBCR) to the North Shore Channel (NSC).   IDCS was responsible for all power, lighting, and security camera design for the pump station and the inlet, as well as the control design which needed to be coordinated between both the City of Chicago Department of Transportation and MWRDGC. 

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, CDWM, Drafting, MWH, Chicago IL
3. DCS Improvements- Stickney WRP

IDCS provided professional engineering construction services, including construction observation, engineering, start-up services and CAD drafting for this complete control replacement at the world's largest water reclamation plant.

Tags: Water & Wastewater, Construction Services, Green Infrastructure, Chicago IL, MWRDGC, MWH
4. Indiana Harbor Control WWTP

IDCS completed the Electrical and Instrumentation design for a new wastewater treatment facility for the treatment of contaminated groundwater, as well as the associated new Administration and Maintenance Buildings.

Tags: Water & Wastewater, Construction Services, Electrical Design, Green Infrastructure, Drafting, USACE, MWH, East Chicago IN
5. Upper Des Plaines Pumping Station

The project was a complete study and rehabilitation of a major pump station serving the Upper Des Plaines River service area, and installation and control of a bypass to the TARP System to accommodate emergency events. IDCS was responsible for all Electrical and Instrumentation studies, as well as design and construction services on this major project.

Tags: Water & Wastewater, Electrical Design, Instrumentation Design, Vulnerability and Risk Assessments, Construction Services, MWRDGC, MWH, River Forest IL, Drafting

Displaying: 1 - 5 of 5

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google