Search Results

There are 36 item(s) tagged with the keyword "Chicago IL".

Displaying: 1 - 10 of 36

1. Stickney WRP Effluent Water Pump Station

IDCS was selected by AECOM to assist in the electrical and control design of an effluent water pump station for the MWRDGC Stickney WRP.  The pump station was to supplement the supply of treated effluent that was reused for non-potable water applications throughout the plant.

Tags: MWRDGC, Water & Wastewater, Electrical Design, AECOM CTE, Chicago IL
2. Stickney Primary Settling Tanks and Aerated Grit Facility Electrical Study

MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.

Tags: Chicago IL, Greeley & Hansen, Water & Wastewater, Arc Flash and Coordination Studies
3. Central Park Pumping Station Electrification

The Central Park Pumping Station Electrification project is to convert a steam-powered pumping station to electrically driven pumps, and rehabilitate and upgrade the electrical services to the pump station.

Tags: Greeley & Hansen, CDWM, Chicago IL, Water & Wastewater, Electrical Design
4. Stickney Westside Primary Settling Tanks and Aerated Grit Facility

MWRDGC initiated a project for the replacement of a portion of the 1920’s Westside Treatment Plant at the Stickney WRP with new Aerated Grit Facilities and Primary Settling Tanks.

Tags: Chicago IL, Greeley & Hansen, Instrumentation Design, Water & Wastewater
5. Jardine Water Purification Plant Chlorine System Improvements

The Jardine Water Purification Plant (JWPP), is the largest capacity water filtration plant in the world, located in Chicago, Illinois. It draws raw water from two of the city's water cribs far offshore in Lake Michigan and sends nearly one billion gallons (4 million m3) of water per day to consumers in the north and central portions of the city. CMT is the lead engineer for the Chlorine Upgrade. This upgrade encompasses the addition of a redundant chlorine scrubber, modifications to the existing SCADA System to align the Chlorine Control Room with the JWPP SCADA Control Room and upgrades to the existing evaporators, chlorinators and chlorinator flow controllers (26) to a new control platform.

Tags: CDWM, Water & Wastewater, Instrumentation Design, Chicago IL
6. Calumet Biogas Renewable Energy Project

The Digester Gas Utilization Facilities, at the Calumet Water Reclamation Plant (CWRP) will enable the District to treat biogas generated from their current digestion process along with future digestion of a high-strength organic waste stream (currently under design by the District).  The digester gas from these two sources will be treated at the CWRP to a level of quality acceptable for injection into a natural gas pipeline, through the new High BTU plant. 

Tags: MWRDGC, Chicago IL, Electrical Design, Instrumentation Design, Water & Wastewater
7. Eugene Sawyer (South Water) Purification Plant Switchgear and Generator Improvements (Resident Engineering)

The South Water Purification Plant project includes the installation of generators with paralleling switchgear in a permanent structure to provide emergency power for the plant to the Main 2300V Switchgear. IDCS served as a resident for the Electrical scope of the construction

Tags: Chicago IL, Greeley & Hansen, Construction Services, CDWM, Water & Wastewater
8. Condition Assessment Report Eugene Sawyer Water Purification Plant

IDCS was contracted to perform Electrical Engineering Services for the Condition Assessment of the South Water Purification Plant

Tags: Vulnerability and Risk Assessments, Water & Wastewater, AECOM CTE, Electrical Design, Instrumentation Design, CDWM, Chicago IL
9. Upgrade of the Chillers and South Cooling Tower (OHare)

O'Hare International Airport serves over 150,000 passengers on a daily basis. The Heating and Refrigeration (H&R) Building is responsible for heating and cooling all of the airport buildings.

Tags: Electrical Design, CDA, RME, Chicago IL
10. 77th Street Bus Garage and South Shops Improvements

Largest CTA Fueling facility, that includes bus maintenance (both light and heavy duty) as well as bus washing. This facility services over 400 buses a day. IDCS involvement in the site improvements and remediation project was both mechanical and electrical in nature.

Tags: Government, Electrical Design, Green Infrastructure, CTA, CDM, Chicago IL

Displaying: 1 - 10 of 36

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google