Government

Asset Management
Asset Management

IDCS worked as a sub-consultant to Brown and Caldwell to standardize and optimize St. Louis MSD asset management practices. Our team utilized our experience with IBM Maximo software to research and analyze assets within the MSD system.  These efforts were formalized into the Strategic Asset Management Plan (SAMP) and Tactical Asset Management Plan (TAMP) reports.

Tags: Government
St. Louis City Parks
St. Louis City Parks

For the St. Louis City Parks project, IDCS designed electrical upgrades at the historic Carondelet Park Boathouse and the Beckett Park comfort station.

Tags: St. Louis MO, Government, exp, Electrical Design
Various Movable Bridges Automation
Various Movable Bridges Automation

IDCS was contracted to work on six operable IDOT bridges over the Des Plaines River in Joliet, IL. Each of the six bridges is subject to both automobile and pedestrian traffic, while the thoroughfare below is subject to varying levels of maritime traffic, both commercial and private in nature (e.g. freight barges and sailboats).

Tags: Government, Vulnerability and Risk Assessments, Electrical Design, Green Infrastructure, IDOT, Modjeski & Masters, Joliet IL, Transportation
Repair of Electrical Infrastructure Systems 5th Medical Group, Minot AFB
Repair of Electrical Infrastructure Systems 5th Medical Group, Minot AFB

IDCS worked as a sub-consultant to SpecPro for power studies for an Air Force base located in Minot North Dakota. Utilizing SKM software IDCS completed a short circuit study which included over 300 bus points from the incoming service entrance to the panelboard distribution level.

Tags: Government, Vulnerability and Risk Assessments, Green Infrastructure, USACE, SpecPro, Minot ND, Arc Flash and Coordination Studies, Drafting
Tyndall Air Force Base
Tyndall Air Force Base

Tyndall AFB Medical Center is a 50,000 square foot building contained over 70 distribution panels in various stages of life, as well as 30 transformers. The scope of this project was to update and eliminate panels and transformers where possible and create a new efficient electrical distribution system.

Tags: Government, Vulnerability and Risk Assessments, Electrical Design, Construction Services, Green Infrastructure, USAF, Kroeschell, Panama City FL, Arc Flash and Coordination Studies
OHare East Cooling Tower Replacement
OHare East Cooling Tower Replacement

IDCS was contracted to participate in the East Cooling Tower Replacement project at the Chicago O'Hare International Airport. The East Cooling Tower is responsible for providing cooling to the Terminal Building at O'Hare International Airport.

Tags: Government, Electrical Design, Federal Classification Codes, Green Infrastructure, CDA, Burns & McDonnell, OHare International Airport, Chicago IL
Cook County Division XI Security Upgrades
Cook County Division XI Security Upgrades

Division XI is a state of the art 640,000 square foot, medium-security facility. Consisting of central core surrounded by four housing PODS, Division XI can house 1,536 male detainees.

Tags: Government, Electrical Design, Instrumentation Design, Construction Services, Green Infrastructure, Cook County, PSA Dewberry, Chicago IL
CDoE Solar Assessment
CDoE Solar Assessment

Intelligent Design and Construction Solutions, LLC was subcontracted by MWH for the City of Chicago Department of Environment (CDoE) to visit and assess solar array sites. These sites varied in nature from Chicago Public Schools, to community centers, to a heritage museum.

Tags: Government, Vulnerability and Risk Assessments, Green Infrastructure, CDOE, Solar, MWH, Chicago IL
Brentwood Boulevard/Carondelet Avenue Streetscape
Brentwood Boulevard/Carondelet Avenue Streetscape

Intelligent Design & Construction Solutions, LLC was chosen to team with M3 Engineering for the project to provide street renovations in the City of Clayton, Missouri, near Brentwood and Carondelet Avenues.

Tags: Government, Electrical Design, Green Infrastructure, M3 Engineering, Clayton MO, Transportation
77th Street Bus Garage and South Shops Improvements
77th Street Bus Garage and South Shops Improvements

Largest CTA Fueling facility, that includes bus maintenance (both light and heavy duty) as well as bus washing. This facility services over 400 buses a day. IDCS involvement in the site improvements and remediation project was both mechanical and electrical in nature.

Tags: Government, Electrical Design, Green Infrastructure, CTA, CDM, Chicago IL
OHare Firefighter Simulator Building
OHare Firefighter Simulator Building

IDCS was responsible for providing the design of the Electrical Distribution and Lighting Systems for a new Firefighter Simulator Building for the City of Chicago at the O'Hare International Airport. The building was approximately 3,000 square feet and included an 18' high simulator area.

Tags: Government, Electrical Design, Instrumentation Design, Green Infrastructure, CDA, Hyre Electric Company, Bensenville IL, Drafting

Locations

Chicago Office
200 West Adams
Suite 1825
Chicago, IL 60606
708.445.7537

New York Office
60 E. 42nd
Suite 4600
New York, NY 10165
212.485.9831

St. Louis Office
500 N. Broadway
Suite 1450
St. Louis, MO 63102
314.549.4404

Connect with Us

Visit IDCS, LLC on Linkedin LinkedIn

Visit IDCS, LLC on Twitter Twitter

Visit IDCS, LLC on Google+ Google